Billable and non-billable hours are both work
Billable hours are the time your team spends on work a client pays for. Non-billable hours are everything else that keeps the agency running: pitches, internal tools, training, reviews. Both are work, and both belong in the timesheet. In PeopleMuster every project carries a billable or non-billable flag, so one log gives you the full week and the billable share.
Product facts from the PeopleMuster projects list, daily recap, utilisation report and capacity grid. The worked example uses stated inputs.
What counts as non-billable work
Non-billable work is any hour spent for the agency rather than for a client. Most of it is planned and useful, and some of it wins your next contract.
You'll recognise the usual list. Each item is time a person spent working, even though no client pays for it directly.
- Proposals, pitches and scoping calls before a contract is signed
- Internal tools, templates and your own website
- Training, mentoring and code reviews
- Team meetings, planning and one-to-ones
- Fixes on a fixed-price project after its budget has run out
Track only billable hours and the rest looks idle
Plenty of agencies ask their people to log client time and nothing else. That feels efficient, and it hides a large part of the week.
Take a designer with a 40-hour week who logs 28 hours on client projects. If the other 12 hours go unlogged, the report says she spent 30% of her week doing nothing. In fact she spent it on a pitch and a design system your whole team uses.
Now you've lost two things. You can't see what the pitch cost in time, and you can't tell a quiet week from a busy one spent on internal work.
Log every hour against a project
Your fix is simple: make internal work a project too. Give a pitch, your internal tools and training a project each, flagged non-billable. People then log to them the same way they log client time.
In PeopleMuster your team logs each day in the daily recap, hours per project. Your week's summary shows logged hours against expected hours, so a gap stands out before the week closes.
Managers approve timesheets from one queue, and a Needs Attention view gathers the entries to look at. A logging window you set decides how far back a person may still add hours.
Read the billable share, not the total
Once every hour is logged, you can read two numbers from one timesheet. Total hours tell you how much your team worked. Your billable share tells you how much of it went to clients.
In the worked example, 28 of 40 hours is a 70% billable share. You can see the other 30% now, split across a pitch, a tool and a review, and you can decide whether that mix is right.
PeopleMuster's utilisation report breaks hours down by project and by department, with a week-over-week trend. You can also filter the projects list to billable or non-billable in one click.
Plan both kinds of work
Non-billable work needs room in the plan, or it gets squeezed into evenings. Put it on the capacity plan the same way you put client work there.
PeopleMuster's capacity grid filters by billable and non-billable, so you can see the client load apart from internal time. Approved leave and company holidays show on the same grid, and every project also carries a fixed-price or hourly flag.
If a fixed-price project keeps pulling non-billable hours, you'll see it in the grid and in the report. That's the conversation to have with the account lead this week.
Questions people ask
What is the difference between billable and non-billable hours?
Billable hours are time spent on work a client pays for. Non-billable hours are time spent for the agency itself, such as pitches, internal tools, training and team meetings. Both are work, and both should be logged.
Should an agency track non-billable time?
Yes. Without it, a person who logs 28 client hours in a 40-hour week looks 30% idle. PeopleMuster logs every hour against a project flagged billable or non-billable, for $3 per person per month with every module included.
How do I calculate a billable share?
Divide billable hours by total logged hours for the same period. 28 billable hours out of 40 logged is a 70% billable share. Our free billable hours percentage calculator does the sum for any week.
Read next
- Daily time logging by project, with approvals
- Utilisation by project and department
- Billable hours percentage calculator
- Tracking billable hours across projects
- Measure utilisation in hours first
- $3 per person per month, every module included
- More notes
- Capacity Is Not Utilisation
- A Leave Calendar Nobody Checks Is Not a Plan
- Most HR Software Lists Are Written by Vendors
- Project Risk Shows Up in Meetings First
- Every term in the glossary